Suburban Homes Construction Project

Continuing with the Suburban Homes Construction Project case study found at the end of chapter 6 (and reviewing previous chapters 1 through 5), CPM 4e, complete the following individual assignment:

(20 points) Stakeholder identification and prioritization matrix

(20 points) Stakeholder Matrix

(20 points) Stakeholder Engagement Matrix

(20 points) Communication Matrix

(20 points) Mechanics

You will be assessed on content and mechanics.

Content (80 points):  The content must be based on the case study materials and reading assignments.  The PMBOK 6e and CPM 4e, along with other reputable resources can be used to supplement the responses through summarizing, paraphrasing and quoting those sources. Each matrix should be followed by a discussion of the matrix and how to use/interpret it.

Mechanics (20 points):  The total assignment length should be at least 3 pages, not to exceed 4 pages.  This is not an academic paper, therefore you do not need to follow APA guidelines.

Order Similar Assignment Now!

  • Our Support Staff are online 24/7
  • Our Writers are available 24/7
  • Most Urgent order is delivered within 4 Hrs
  • 100% Original Assignment Plagiarism report can be sent to you upon request.

GET 15 % DISCOUNT TODAY use the discount code PAPER15 at the order form.

Type of paper Academic level Subject area
Number of pages Paper urgency Cost per page:
 Total: